Preparations for building the third floor took place in March and April 2009.

  • South face showing trees trimmed and old roof removed.

    South face showing trees trimmed and old roof removed.

  • New electrical lines were installed to the building.  Interior electrical wiring must be updated. Energy efficient windows need to be installed.